GL200S Crawler Water Well Drilling Rig
Technical Parameter | |
Max. Drilling Depth | 200m |
Drilling Hole Dia. | 90-315mm |
Working Pressure | 1.7-3.0Mpa |
Air Consumption | 17-35m3/min |
Drill Pipe Length | 3m |
Drill Pipe Dia. | 76mm/89mm |
Axial Pressure | 4T |
Lifting Force | 14T |
Lifting Speed | 2.5m/min |
Push Speed | 0.5-5m/min |
Fast lifting Speed | 35m/min |
Max.Rotation Torque | 4500-6500Nm |
Rotation Speed | 50-70r/min |
Working Hoist Lifting Force | 1.5T |
Mud Pump Flow Rate | 20L/min (optional) |
High Pressure Hydraulic Legs Stroke | 1.5m |
Drilling Efficiency | 10-35m/h |
Travel Speed | 2Km/h |
Grade ability | 30° |
Weight | 5.4T |
Dimension | 3.9x1.7x2.15m |
Diesel Engine | 77KW(Yuchai ) |
Application formation | loose layer or bedding rock |
Drilling Method | Top Hammer Hydraulic Rotating and feeding, Down the hole hammer or mud pump drilling |